Work has almost finished on the original triangle loo its looking smart and well lit, last few things to do vinyl on the floor, hinges on the boiler door, door handle, loo seat, loo roll holder, hang the blue postcard display and under the baby changing table left to complete.
The undercover yard – is still being used as the workshop for the Loo and upstairs porch work but is getting emptier and close to a final tidy up – almost nothing left to do now – a real good sweeping and the 31′ x 17′ space is ready for use.
The curiosity cupboard is next to be refurbished – new hinges have arrived and its new use as a paint brush store being planned. It is set behind the newly installed Belfast sink with integral draining board and overhead light.

View from reception 
Belfast sink 
Baby Changing table
See more photographs in Sept 2021 photos