
In progress Baby Changing table 
Boxing in the pipes in old loo 
A good clean and maybe shelves under

The beginning of the baby changing table 
The marble top with wood & tile 1920’s wash stand back 
Marble top fitting

2nd coat of brick red – white with holes filled waiting top coat 
Inside of doors getting undercoated

Front of coach house getting some TLC 
waiting for second coat of paint 
A little pointing was required

New arrivals from the farm

Ceiling coming down, undercover yard 
You can see the lovely floorboards 
40 years of sawdust 
Sawdust mountain 
Dusty webs on gates 
packed with sawdust now all gone 
Building can breathe again 
Horses at the gallery

Front door 
Seating in the garage gallery 
Gas Cupboard

Cameron helping out in gallery 
Undercover yard stairwell gets first coat of paint in a long time 
Prints have arrived

Guard rail for safe inspection of the fleet 
Re-use is better than recycle 
internal stairs to St. Saviours studio

Fold down tables outside space and drive 
Tables and Sculptures on display wall

Sign on rear of building 
Can be seen from Taunton Rd 
Standing wood in zen garden

Zen garden plan 
Animal alphabet colouring for gallery visiting kids

Trade Mark info swing ticket 
There but not so in your face 
Grey/silver ribbon to blend with wall